Skip to main content
Updated · November 2026 11 min read Cut-Off Times

France Cut-Off Times Explained (ENS, DELTA, and Port Deadlines for Importers)

Get clear on France's unique cut-off times: ENS filing, DELTA customs, port deadlines, and compliance checks. Avoid shipment holds and delays at French entry points.

Lucas Arillotta
Lucas Arillotta Supply Chain Manager at SINO Shipping
Get France Shipping Quote

Free quote · No obligation

China Cut-Off Times
world map
Sea freight
$2,228–$2,722
Air freight
$5.9/kg
Sea transit
25–28 days
Air transit
5–7 days
In this guide
  1. 01 Backward Planning
  2. 02 Real Cut-Offs
  3. 03 Rule Makers
  4. 04 Mode Planning
  5. 05 France’s unique customs mechani…
  6. 06 Non-Negotiable Checklist
  7. 07 Common Mistakes
  8. 08 Bottom Line
The essentials of the article
  • ENS (Entry Summary Declaration) must be filed at least 4 hours before long sea arrival or 1 hour before air arrival in France.
  • DELTA, France's electronic customs system, enforces declaration cut-offs before vessel or flight arrival.
  • EORI registration is mandatory for all France imports and typically takes 1–3 days with no direct fee.
  • Missing ISPM 15 wood packaging compliance can result in immediate cargo rejection at French ports.
Lucas Arillotta Lucas Arillotta · Supply Chain Manager at SINO Shipping ·

A missed cut-off in China isn’t just a paperwork hassle—it’s a domino effect that can push your France-bound cargo back by a week or more. The stakes are high: French ports and customs operate on strict schedules, with electronic platforms and regulatory deadlines that leave little room for error. Whether you’re shipping FCL containers to Le Havre, LCL cargo to Marseille, or air freight to Charles de Gaulle, your timeline is dictated by a sequence of cut-offs—each controlled by a different authority. If you miss even one, your cargo won’t sail, your costs climb, and your customer waits.

This guide breaks down every operational deadline you’ll face when shipping from China to France. We show you how to plan backward from ETD (Estimated Time of Departure), clarify who controls each cut-off, and help you lock every step before your cargo moves. It’s the practical foundation for choosing your shipping mode, booking windows, and shipping calendar planning—all part of our full France shipping guide.

How to Plan Backward from ETD (France’s cut-off logic explained)

Every successful France shipment starts with a backward plan from ETD, not ETA. The moment your vessel or flight departs is the point of no return. French ports—especially Le Havre and Marseille—operate on strict receiving schedules, enforced by customs and port authorities through electronic platforms like DELTA. The same logic applies to air cargo at Charles de Gaulle and rail at Lyon.

Why French cut-offs differ from Asia

Unlike many Asian ports, France’s cut-off structure is tightly integrated with customs and regulatory controls. The ENS (Entry Summary Declaration) is mandatory for all imports—filed hours before arrival, not just before departure. The DELTA system requires electronic customs declarations before your cargo lands, and missing these deadlines leads to shipment holds or costly rollovers. Add port and terminal closings, and you have a sequence that’s unforgiving.

We see importers trip up because they’re used to more flexible systems. In France, every operational step is a hard deadline—set by customs, port, or regulatory bodies. There’s no “grace period” for late documents or compliance gaps.

Key timelines: Sea vs Air vs Rail

France’s main entry points each have their own cut-off logic:

  • Sea freight: Le Havre (28–35 days from Shanghai), Marseille (30–38 days from Shenzhen). Weekly sailings mean missing a cut-off can cost you a week.
  • Air freight: Charles de Gaulle (2–5 days from Shanghai). Daily flights, but ENS filing is required one hour before arrival.
  • Rail: Lyon terminal (18–22 days from Wuhan). Weekly block trains, with customs and terminal cut-offs similar to sea.

Plan backward from ETD

Set your sailing date, mode, and origin — get the deadlines to ship to France.

Your timeline (earliest to latest)

Hit each deadline to make sailing on Mon, 7 Dec 2026

  1. Cargo ready at factory

    Sat, 28 Nov 2026

    Packed, labelled, CBM confirmed

  2. Pickup (truck to CFS)

    Sun, 29 Nov 2026

    Supplier releases; truck to CFS

  3. SI / docs cut-off

    Sun, 29 Nov 2026

    B/L data: consignee, marks, HS, weights

  4. CFS receiving

    Tue, 1 Dec 2026

    Cargo at CFS for consolidation

Times are indicative. Confirm actual cut-offs with your forwarder.

Planning backward from ETD means you lock in every step: ENS filing, DELTA declaration, CY/CFS closing, VGM (for FCL), docs, compliance, and packaging. If you’re unsure how these fit together for your lane, use our best shipping lanes guide to check transit times and cut-off cycles.

The Real Cut-Offs You’ll Face (definitions for France-bound freight)

French import cut-offs aren’t just about port schedules—they’re a sequence of regulatory, customs, and operational deadlines. Here’s what you’ll actually face, mode by mode:

ENS filing cut-off (all modes)

ENS (Entry Summary Declaration) must be filed electronically before arrival:

  • Sea (long haul): 4 hours before vessel arrives
  • Air: 1 hour before flight lands

Miss this, and your shipment is held at arrival. ENS is filed via the DELTA platform and is required for all modes.

DELTA customs declaration cut-off

The DELTA system enforces a customs declaration cut-off. You must submit your declaration before the vessel or flight arrives. Customs release depends on timely filing—delays mean storage and demurrage costs.

CY closing (FCL containers)

CY (Container Yard) closing is the last possible time your FCL container can enter the port for loading. Typically 24–48 hours before ETD, but can tighten during holidays or peak periods.

CFS receiving closing (LCL cargo)

CFS (Container Freight Station) receiving is the deadline for LCL cargo drop-off. Usually 48–72 hours before ETD; the CFS operator controls this, and late cargo is rolled to the next sailing.

VGM cut-off (FCL export)

VGM (Verified Gross Mass) submission is mandatory for all FCL exports. Cut-off is often 24–36 hours before ETD. Without a valid VGM, your container won’t be loaded.

Docs / SI cut-off (Shipping Instructions)

Shipping Instructions (SI) and supporting documents (commercial invoice, packing list, etc.) must be submitted before CY/CFS closing. SI cut-off is usually 48–72 hours before ETD, but check with your forwarder.

CE marking / compliance docs cut-off

CE marking and compliance documents must be ready before customs declaration. DGCCRF reviews these, and missing or incomplete docs can halt clearance.

ISPM 15 wood packaging cut-off

All wood packaging (pallets, crates) must carry a valid ISPM 15 stamp. French ports reject cargo with missing or illegible stamps—check before cargo leaves China.

France cut-offs

Cut-off → who controls → common failure

ENS filing Customs (DELTA) Missed filing → shipment hold
DELTA declaration Customs (DELTA) Late filing → delayed clearance
CY closing (FCL) Port terminal Gate closed → wait for next sailing
CFS receiving (LCL) CFS operator Late drop → cargo rolled
VGM submission Carrier/terminal No load → container stays
SI/documents Forwarder No B/L → shipment blocked
CE marking DGCCRF Missing docs → customs hold
ISPM 15 stamp Port inspection Cargo rejected → return or destroy

Miss any of these, and your shipment is either rolled, blocked, or held for inspection. For more detail on each, see customs clearance via DELTA, CE marking requirements, and EUR-EPAL pallet standards.

Who Sets the Rules? (French customs, port, and regulatory controls)

Cut-off enforcement in France is multi-layered. Here’s who controls what:

Customs: DGDDI & DELTA platform

The Direction Générale des Douanes et Droits Indirects (DGDDI) manages customs controls, using the DELTA electronic platform. ENS and customs declarations are filed here, and DGDDI decides whether your cargo is cleared or held.

Product compliance: DGCCRF

The Direction générale de la concurrence, de la consommation et de la répression des fraudes (DGCCRF) oversees product compliance. They review CE marking, safety, and labeling documents. Missing compliance docs can halt clearance.

Port/terminal authorities

Port and terminal authorities set operational cut-offs—CY closing for FCL, CFS closing for LCL, and VGM deadlines. They enforce physical access and loading schedules.

Here’s a summary table of who controls each cut-off:

Cut-offControlled byImpact of Missed Deadline
ENS filingDGDDI (DELTA)Shipment held at arrival
DELTA declarationDGDDI (DELTA)Delayed customs release
CY/CFS closingPort/CFS operatorCargo rolled to next sailing
VGM submissionCarrier/terminalContainer not loaded
SI/documentsForwarderNo B/L, shipment blocked
CE markingDGCCRFCustoms hold, inspection
ISPM 15 stampPort inspectionCargo rejected, possible return

For deeper dives, see door-to-door vs port-to-port comparison, pickup and origin services, and last-mile delivery in France.

Planning by Mode: Sea, Air, and Rail to France (what’s different?)

France’s main entry points—Le Havre, Marseille, Charles de Gaulle, and Lyon—each have their own cut-off patterns. Here’s how they differ:

Sea freight: Le Havre, Marseille

Le Havre serves northern France and Paris, with weekly mainline sailings from Shanghai (28–35 days). Marseille covers southern France, with sailings from Shenzhen (30–38 days). CY closing is typically 24–48 hours before ETD, but can tighten around holidays like Bastille Day or Labour Day.

LCL cargo faces CFS receiving cut-offs—usually 48–72 hours before ETD. For FCL, VGM must be submitted 24–36 hours before ETD.

For mode comparison, see FCL vs LCL sea freight.

Air freight: Charles de Gaulle

Charles de Gaulle Airport is France’s main air freight gateway. Daily flights from Shanghai land in 2–5 days, but ENS filing is due 1 hour before arrival. Customs clearance is fast (1–2 days), but missing ENS or DELTA filings means your cargo sits in the warehouse.

Compare air vs express in our air freight vs express guide.

Rail freight: Lyon terminal

Lyon is France’s rail gateway, with block trains from Wuhan (18–22 days). Weekly departures, but cut-offs for customs and terminal access mirror sea freight—ENS filing, DELTA declaration, and compliance docs all required before arrival.

If you ship by rail, check booking windows for France and moisture protection tips for containerized goods.

France’s unique customs mechanisms

France’s cut-off system includes several mechanisms specific to EU imports. Here’s what you need to know:

ENS: Entry Summary Declaration deadlines

ENS is required for all imports:

  • Sea: 4 hours before arrival (long sea)
  • Air: 1 hour before arrival

This is filed electronically, and missing the deadline means your shipment is held on arrival.

DELTA: Electronic customs cut-off

The DELTA platform enforces electronic customs declaration deadlines. You must file before the vessel or flight arrives. DELTA is integrated with DGDDI, and delays here cascade into storage and demurrage costs.

EORI: Importer registration timing

Every importer needs an EORI number (Economic Operator Registration and Identification). Processing takes 1–3 days, and you must have this before filing customs declarations. No direct fee, but missing EORI means your cargo can’t clear.

ISPM 15: Wood packaging enforcement

France enforces ISPM 15 for all wood packaging. Pallets and crates must bear a valid ISPM 15 stamp. Ports reject cargo with missing or illegible stamps—expect return or destruction if you fail here.

France import readiness checklist

Complete before cargo ships.

0/8

For more on compliance, see food and cosmetics compliance, value-added services, and import duties and taxes.

Non-Negotiable Checklist (lock these 48–72 hours before French cut-offs)

To avoid last-minute chaos, lock the following steps at least 48–72 hours before your cut-off times:

  • ENS filing confirmation: Entry Summary Declaration filed via DELTA, with accurate cargo details.
  • DELTA declaration ready: Customs declaration prepared and submitted electronically.
  • EORI number validated: Registration processed, number active, and included in all filings.
  • CE marking documents on hand: Compliance certificates, Declaration of Conformity, and test reports ready.
  • ISPM 15 stamp checked: All wood packaging photographed and documented.
  • Shipping Instructions submitted: SI and supporting docs sent to your forwarder.
  • VGM submitted: For FCL, Verified Gross Mass filed before CY closing.
  • Commercial invoice and packing list ready: All documentation matches shipment details.

If you’re using DDP shipping, see DDP checklist for France for additional requirements.

Common Mistakes Importers Make (France-specific shipment pitfalls)

Even seasoned importers get tripped up by France’s cut-off system. Here are the most frequent—and costly—mistakes:

Missing ENS or DELTA deadlines

ENS filing and DELTA declaration are strictly timed. Miss the deadline, and your cargo is held at arrival—no exceptions. We see this often with air freight, where the window is just one hour before landing.

Incorrect or missing EORI number

EORI registration is mandatory. If your number is missing, invalid, or not included in customs filings, your shipment can’t clear. Processing takes 1–3 days; don’t leave this to the last minute.

No CE marking or compliance docs

DGCCRF checks for CE marking and compliance documentation. Missing certificates or incomplete paperwork means inspection, delays, or rejection.

Non-compliant wood packaging

ISPM 15 is enforced at all French ports. If your pallets or crates lack a valid stamp, cargo is either returned or destroyed. This is a common—and expensive—mistake.

French national holidays—Bastille Day (July 14), Labour Day (May 1), Christmas (December 25)—cause port and customs closures. Cut-off times move forward, and late bookings are rolled. Always check the shipping calendar for holiday impacts.

MistakeImpactPrevention
ENS filing missedShipment held at arrivalFile ENS early via DELTA
DELTA declaration lateClearance delayed, storage feesSubmit before vessel/flight lands
EORI number missingCannot clear customsRegister 1–3 days in advance
CE marking docs absentInspection, rejectionPrepare docs before shipping
ISPM 15 stamp missingCargo rejectedUse compliant pallets/crates
Holiday cut-off misjudgedRoll to next sailing/flightCheck calendar, book early

Bottom line (what to remember for France cut-off times)

France’s cut-off system is unforgiving—every operational step is a hard deadline, enforced by customs, port, and regulatory bodies. Plan backward from ETD: lock ENS filing, DELTA declaration, EORI, CE marking, and ISPM 15 compliance well before your cargo moves. Missing even one deadline means costly delays, rollovers, or outright rejection. Use our booking windows guide and shipping calendar to avoid holiday pitfalls. For tailored advice and timeline planning, request a France shipping quote—we help you hit every cut-off, every time.

ReferenceGlossary· 35 terms

Search a term, or jump by letter.

advance
When the carrier or broker pays duties, taxes, or fees to customs on your behalf and invoices you later. Often used with disbursement; confirm who pays the advance and any fee.
B/L
Bill of Lading. Transport document issued by the carrier; evidence of contract and (for negotiable B/L) title to the goods.
CE
Conformité Européenne. EU mandatory marking for products sold in the EEA. Does not transfer to Japan—PSE and TELEC are separate regimes.
CFS
Container Freight Station. Facility where LCL cargo is consolidated (origin) or deconsolidated (destination). Under FCA (CFS), the seller delivers loose cargo here; hand-off and risk transfer at receipt.
clearance
Customs clearance. Process of presenting goods and documents to customs and obtaining release for import or export. Export clearance (who files it) is the key difference between EXW and FOB.
Commercial Invoice
Document stating value, description, and terms of the goods; required for customs and payment.
cut-off
Deadline by which cargo or documents must be received to make a specific sailing or flight. Missing it usually means a day's delay.
CY
Container Yard. Terminal area where full containers are received, stored, and delivered. Under FCA (CY), the seller delivers the stuffed container here; hand-off and risk transfer at gate-in.
DDP
Delivered Duty Paid. Seller pays all costs to the buyer's door, including clearance, duties, and Consumption Tax. True DDP means the recipient pays nothing at delivery.
Declaration of Conformity
Bản công bố hợp quy. Required document stating imported products meet relevant Vietnamese technical regulations.
DELTA
Dédouanement En Ligne par Traitement Automatisé. France's electronic customs clearance system for import/export declarations.
demurrage
Charge when cargo stays at the terminal beyond the free time allowed. Often due to late docs or delayed pickup.
DGDDI
Direction Générale des Douanes et Droits Indirects. France's national customs authority responsible for border control and tax collection.
docs cut-off
Deadline to submit SI and other documents so the B/L can be issued before the sailing. Late docs delay B/L and NACCS clearance in Japan.
door-to-door
Service from shipper's door to consignee's door. The forwarder or carrier coordinates all legs, including pickup and delivery.
EORI
Economic Operators Registration and Identification number. Required for all businesses importing into Poland from outside the EU.
ETA
Estimated Time of Arrival. When a vessel or flight is expected at destination.
ETD
Estimated Time of Departure. When a vessel or flight is scheduled to leave origin.
FCL
Full Container Load. You book an entire container (e.g. 20GP or 40HC); only your cargo inside.
forwarder
Freight forwarder. Company that books transport, arranges documentation, and often coordinates customs on your behalf.
grace period
Free waiting time before per-minute or per-15min charges apply. Japan last-mile often allows 30–60 min; beyond that, waiting time is billed quickly.
ISPM 15
International Standards for Phytosanitary Measures No. 15. Treatment standard for wood packaging (pallets, crates)—heat treatment or fumigation mark required. Non-compliant wood blocks Japan import release.
last-mile
Final leg of delivery from port, airport, or warehouse to the consignee's address. May include remote-area or residential surcharges.
LCL
Less than Container Load. Your cargo shares a container with others; priced per CBM (plus CFS and handling at both ends).
no load
When a container does not load despite being at the terminal. Often due to missing VGM—carriers will not load without it. Results in rollover and rebooking.
Packing List
Document listing contents, weights, and packaging of each package; used for customs and cargo handling.
pickup
Factory collection. Truck books, loads at origin, and transports cargo to the CFS, CY, or airport. Distance, multi-supplier stops, and cargo readiness affect cost.
port-to-port
Service from origin port to destination port only. You (or your forwarder) arrange pickup and delivery separately.
REACH
Registration, Evaluation, Authorisation and Restriction of Chemicals (EC 1907/2006). EU regulation controlling chemicals in products imported into Portugal.
RoHS
Restriction of Hazardous Substances Directive (2011/65/EU). EU directive limiting hazardous substances in electrical and electronic equipment imported into Portugal.
roll
When cargo misses a cut-off and is moved to the next sailing or flight. 'You roll to the next one' = +7 days or more for sea; plan cut-offs to avoid rolling.
Shipping Instructions
SI. Data you submit for the B/L: consignee, notify party, marks, HS codes, weights, description. Late SI = late B/L = clearance delay in Japan.
SI
Shipping Instructions. Data you submit for the B/L: consignee, notify party, marks, HS codes, weights, description. Late SI = late B/L = clearance delay in Japan.
value-added services
Logistics services beyond basic freight: repacking, labeling, palletization, inspection. Often billed per unit; request a breakdown to avoid vague invoice lines.
VGM
Verified Gross Mass. Mandatory certified weight of a packed container (SOLAS); required before loading.