Skip to main content
Updated · November 2026 16 min read Booking Windows

When to Book Shipping Space to Japan: Peak Season, Typhoons & Plan B

Shipping to Japan during peak season or typhoon risk? Learn when to book space, how capacity tightens for air/sea, and a disruption playbook for reroutes, buffers, and backups.

Lucas Arillotta
Lucas Arillotta Supply Chain Manager at SINO Shipping
Get Japan Shipping Quote

Free quote · No obligation

China Booking Windows
world map
Sea freight
$205–$315
Air freight
$1.4/kg
Sea transit
9–10 days
Air transit
2–3 days
In this guide
  1. 01 60-second booking model
  2. 02 Peak season bottlenecks
  3. 03 Recommended booking windows
  4. 04 Typhoon disruption planning
  5. 05 Disruption playbook
  6. 06 Hidden disruption costs
  7. 07 Common mistakes
  8. 08 Bottom line
The essentials of the article
  • Two delay drivers: capacity (peak season) and weather (typhoons)—both are fixed before shipping.
  • Book earlier on cut-off, consolidation, and appointment—not just ETD. LCL CFS cut-offs are the main rollover trigger.
  • Add a Plan B (split, reroute, mode shift) before you need it. Define priority SKUs and allowable reroutes with your forwarder.
  • Space confirmation doesn't eliminate rollover risk. Plan for release + delivery in Japan, not just port ETA.
Lucas Arillotta Lucas Arillotta · Supply Chain Manager at SINO Shipping ·

Most China→Japan delays don’t happen because of transit time—they happen because of capacity and weather. Peak season fills air allotments and sea sailings; typhoons close ports, divert flights, and force rebooking waves. The fix for both: decide before the shipment leaves. Not when the container is already in Shanghai or the pallet is at the airport.

This page gives you a clear framework for two things: when to secure space (Express, Air, LCL, FCL) and how to build a realistic Plan B when disruptions hit. It complements our shipping calendar (cut-offs and holidays) and best lanes (port choice)—here we focus on space strategy and disruption readiness so you book at the right moment and know what to do when things go sideways. Part of our full Japan shipping guide.

The 60-second booking model (what you need before you talk to a forwarder)

Before you call a forwarder or send a quote request, lock in four things. Each one narrows your options and changes when you should secure space. Get them wrong and you’ll either overpay for urgency or miss your window.

  1. Destination + delivery date — Where in Japan is the cargo going? Kanto (Tokyo/Yokohama), Kansai (Osaka/Kobe), or Chubu (Nagoya). The real deadline isn’t port ETA—it’s when your warehouse appointment is, or when the consignee must receive. Everything backs up from that. Kanto slots fill fastest; plan earlier if you’re delivering to Greater Tokyo.

  2. Mode + Incoterm — Express, Air, LCL, or FCL. Each has different cut-offs, capacity constraints, and peak sensitivity. Incoterm matters too: who books freight? FOB vs DDP changes who secures space and when. If your supplier books under FOB, they need to act on your timeline—coordinate early.

  3. Cargo profile — Volume (CBM/kg), product type (batteries, regulated goods, high value). Batteries and dangerous goods add carrier checks and documentation; high-value cargo often needs earlier booking for secure handling. Standard general cargo has more flexibility; regulated or fragile shipments should be locked in sooner.

  4. Risk tolerance — Budget vs certainty. If you’re minimising cost, you might accept later booking and fewer options. If you need a guaranteed delivery window (e.g. retail deadline, production line), book earlier and pay for the buffer. You can’t optimise both at once—choose what matters for this shipment.

Use the tool below: select your inputs and get a book now or book later recommendation plus a suggested buffer. The sections that follow dig into peak-season bottlenecks, mode-specific booking windows, and typhoon disruption planning. For cut-offs and holiday timing, see our shipping calendar.

When should you book?

Adjust your destination, mode, cargo, and risk — get a personalised booking window and buffer.

Recommendation

Book 1–2 weeks before cargo ready

Add a 7–10 days buffer to your planning. Driven by LCL consolidation and CFS cut-offs, Kanto appointment slots fill fast.

Japan peak season: what actually tightens capacity (and why)

Peak season doesn’t mean “everything slows down”—it means specific choke points tighten by mode. Understanding where your shipment hits the wall helps you book earlier at the right stage and avoid the “why is my cargo stuck?” surprise. Here’s where capacity actually bites.

Where the bottleneck is (by mode)

Air — Three gates tighten: allotments (the space your forwarder has reserved on specific flights), flight capacity (planes fill, and China–Japan routes are busy), and volumetric weight penalties (bulky cargo burns more space per kg—you pay more and compete harder for limited slots). Miss an allotment and you roll to the next available flight, often 1–2 days; in peak, that can stretch to a week if flights are full. Book early when your cargo is bulky or your timeline is fixed.

Sea FCL — The pinch is equipment (containers) and vessel space. Empty 20/40 boxes get scarce in high season; carriers prioritise major lanes. Rollovers happen when your container doesn’t make the intended sailing—you’re bumped to the next one, usually +7 days. CY gate-in and docs matter (see our shipping calendar for cut-offs), but the upstream constraint is securing the box and the sailing slot before everyone else does. Lock container plan and gate-in schedule early.

Sea LCL — The most exposed mode during peak. CFS receiving cut-offs in China (when your cargo must arrive at the consolidation warehouse to make the sailing) tighten first—consolidators have limited receiving windows. Consolidation capacity then: they can only build so many Japan-bound LCL shipments per week. Finally, deconsolidation backlog in Japan: when your container lands, the CFS in Yokohama, Kobe, or Nagoya may be saturated. Release and delivery slip. LCL has more handoffs than FCL—each one can delay. Book LCL earlier than you think; CFS cut-offs are the main rollover trigger.

ModeWhere capacity tightens
AirAllotments, flight capacity, volumetric weight
Sea FCLEquipment (containers), vessel space, rollovers
Sea LCLCFS receiving cut-offs, consolidation capacity, deconsolidation backlog in Japan
ExpressDaily cut-offs, surcharges, pickup capacity

The Japan-specific wrinkle

Even when the vessel or flight arrives on time, you can still hit a wall in Japan. Appointments in Kanto (Tokyo/Yokohama) and Kansai (Osaka/Kobe) fill up—warehouses and 3PLs have limited delivery slots. Trucking thins out post-peak or post-holiday: everyone’s cargo lands at once, and there aren’t enough trucks or drivers to clear the backlog. Your container may clear NACCS in 48 hours, but the first available last-mile slot is five days out. Plan for release + delivery, not just ETA. Kanto is typically tighter than Kansai; Chubu (Nagoya) often has slightly more flexibility. Add buffer to your booking timeline so your cargo lands before the post-peak crunch, not during it.

We avoid giving fixed “book X days before” numbers—they depend on lane, season, and your cargo. Instead, here are safe rules you can apply: what to secure early, and what typically causes rollovers. Use them with the Japan Space Readiness tool above and the shipping calendar for cut-offs and holidays.

ModeWhat to book earlyWhat causes rollovers
ExpressLabels and docs ready → book as soon as you have themDaily cut-offs, peak surcharges, pickup capacity
AirSpace when cargo is bulky or peak; prefer flexible flight optionsAllotments fill, volumetric penalties, flight capacity
LCLCFS receiving slot and consolidation capacity—earlier than you thinkCFS cut-off, consolidation backlog, deconsolidation in Japan
FCLContainer plan + CY gate-in schedule for stable ETDEquipment scarcity, vessel space, missed gate-in

Express to Japan

Book as soon as labels and docs are ready. Express moves on daily cut-offs—pickup today vs tomorrow—so the main risk isn’t “weeks ahead” planning; it’s surcharges (peak, fuel, remote area) and missing the daily cutoff because your factory or forwarder didn’t have everything in time. Have labels, commercial invoice, and packing list ready before you request pickup. If your delivery window is tight, lock the express slot 1–2 days before cargo ready; during peak, surcharges spike and capacity can thin—book earlier to avoid premium pricing or next-day roll.

Air freight to Japan

Book earlier when cargo is bulky or when you’re shipping in peak. Bulky cargo burns more space (volumetric weight); airlines and forwarders fill allotments fast. Prefer flexible options: daily flight alternatives (PVG–NRT, PVG–KIX, CAN–NRT) give you a backup if one flight is full. Lock space 3–5 days before cargo ready in normal periods; add a few days in peak. The rollover trigger is usually allotment or flight capacity—once you’re confirmed, the main variable is docs and clearance at destination. Ask your forwarder: “What’s the next available flight if this one doesn’t work?”

LCL to Japan

Book earlier than you think. CFS receiving cut-offs and consolidation capacity are the main rollover sources—not transit time. Your cargo must reach the CFS in China (Shanghai, Ningbo, Shenzhen) by a specific date to make the sailing; miss it and you roll to the next consolidation, often +7 days. During peak, consolidators receive more cargo than they can ship in one sailing—some gets bumped. Secure your CFS receiving slot and sailing confirmation 1–2 weeks before cargo ready when possible; in peak, push that earlier. The LCL vs FCL break-even still applies for volume, but for timing, LCL is the mode that punishes late booking most.

FCL to Japan

Book early for a stable ETD. Confirm container plan (which depot, when the box arrives) and CY gate-in schedule at the China terminal. Equipment and vessel space tighten in peak—carriers prioritise high-volume shippers. Lock your slot 7–10 days before desired gate-in when you can; during Golden Week, Obon, or New Year, add buffer. Rollovers happen when your container doesn’t make the intended sailing: equipment delay, late docs, or gate-in miss. Once you’re gated in, the sailing is largely predictable; the risk is getting to that point. Align with your best lane and cut-off timing so you don’t burn the buffer before the container even leaves.

Typhoons: Japan disruption planning (what changes operationally)

Typhoons add a second layer of risk on top of peak season: ports close, vessels divert, flights cancel, and trucking stalls. The disruption playbook below covers what to do; here we cover what actually breaks and when the risk is highest. Plan buffers and alternative ports or routes before the storm—not after.

What typhoons disrupt (in practice)

Sea freight — Port operations slow or stop: yard closures, vessel schedule changes, berthing delays. Carriers omit ports or divert to alternative terminals. Your container may sit at sea or at an intermediate port until the weather clears. Gate-in and release at both China and Japan ports are affected. Expect rollovers, rebooking waves, and congestion when operations resume.

Trucking and last-mile — Even when the port reopens, trucking restrictions (road closures, safety holds) and missed appointments cascade. Warehouses in Kanto and Kansai reschedule deliveries; slots fill fast as everyone tries to clear backlog. A container that clears NACCS on Tuesday may not get a last-mile slot until the following week. Rebooking waves mean you’re competing with others for the same slots.

Air freight — Diversions and cancellations depend on the typhoon’s path. NRT, HND, KIX, and NGO can be affected; flights may divert to alternative airports or cancel. Air cargo sits at origin or at a hub until capacity returns. Check which zones are impacted—sometimes Shanghai or Guangdong are the bottleneck, sometimes Japan. Prefer flexible routing (e.g. alternative Japan airport) when typhoon season overlaps your shipment window.

Typhoon season pattern (high-level, Japan)

Typhoon season typically runs May–October, with peak activity July–September. Coastal zones (Kyushu, Shikoku, southern Honshu, Okinawa) see more landfalls and near-misses; Kanto and Kansai ports (Yokohama, Tokyo, Kobe, Osaka) can be affected by storms that approach from the south or east. Exact tracks vary—Japan Meteorological Agency (JMA) publishes forecasts and warnings. Plan buffers (extra days before your deadline) and alternative ports or routes (e.g. Osaka if Tokyo is at risk) when shipping in this window. The box below summarises three warning levels and what to do at each.

Watch

Typhoon forming or approaching the region

: Monitor JMA; confirm forwarder has your must-arrive-by date and allowable reroutes.

Likely disruption

Path may affect ports or flight routes

: Activate Plan B: alternative port, alternative sailing, or mode shift. Lock backup option.

Full stop

Ports closed, flights cancelled or diverted

: Hold shipment if not yet shipped; reroute in-transit cargo. Expect rebooking wave—secure slot early.

The Japan disruption playbook: buffers, Plan B and what to tell your forwarder

When peak season or typhoons hit, you need a playbook—not panic. This section covers three things: where to add buffer (so you don’t burn it in the wrong place), Plan B options by mode (what to do when things go sideways), and what to tell your forwarder so they can act without calling you every time. Use the Plan B Selector below to match your delivery criticality to the right actions.

Build buffers where they matter

Buffer on cargo-ready → cut-off, not just on ETA. Many importers add slack to “when the container arrives in Japan”—but the real pinch is often earlier: cargo not ready at the factory, docs late, or CFS/CY gate-in missed. Add buffer at the upstream gates: cargo-ready date, document cut-off, and CFS receiving or CY gate-in. If you hit those, ETA usually holds. If you miss them, no amount of ETA buffer helps.

Also buffer on clearance and appointment in Japan. NACCS clearance can slip if docs are wrong or customs asks for more info. Last-mile appointment slots in Kanto (Tokyo/Yokohama) fill faster than Kansai or Chubu—plan extra days there. When disruptions hit, everyone rebooks at once; your buffer becomes the difference between “delivery Thursday” and “delivery next week.”

Plan B options (by mode)

Sea — Alternative sailing (next vessel on the same route), alternative Japan port (Yokohama vs Tokyo; Kobe vs Osaka—often interchangeable for Kanto/Kansai delivery), or split shipment (air for critical portion, sea for bulk). Tell your forwarder which ports and sailings are acceptable so they can reroute without asking.

Air — Airport flexibility (NRT vs HND vs KIX vs NGO—which can you accept?), partial uplift (ship what fits on the first flight, rest on the next), or express for critical SKUs when air cargo is full. During typhoons, flights divert or cancel; having a backup airport or next-day option reduces the scramble.

LCL — Earlier CFS receiving (can your cargo reach the consolidation point sooner to make an earlier sailing?), avoid tight connections (don’t plan LCL to land the day before your deadline—consolidation and deconsolidation add variability). If disruption hits, LCL is the hardest to reroute quickly; consider splitting to FCL or air for priority cargo.

Communication checklist (what to tell your forwarder)

Lock these in before disruption—not when the storm is already on the radar:

  • Must-arrive-by vs nice-to-have — Is your delivery date non-negotiable (retail drop, production line) or can it slip a few days? Forwarders optimise differently for each.
  • Allowable reroutes — Tokyo vs Yokohama; Osaka vs Kobe; can you accept a different Japan port if the primary is closed or congested?
  • Allowable mode shift — Can part of the shipment go air if sea is delayed? Are you willing to pay for express on critical SKUs? Define “yes” and “no” upfront so they can execute without approval loops.

The tool below maps your delivery criticality (high / medium / low) to recommended Plan B actions. Use it to decide what to communicate and what to prepare for.

What's your Plan B?

Set your delivery criticality — see recommended actions when disruption hits.

Mode shift or alternative sailing

  • Upgrade a portion to air if sea is delayed
  • Reroute to alternative port or next available sailing
  • Allowable reroutes and mode shift—define upfront

Some flexibility; minimise cost while protecting the timeline.

Hidden costs during disruptions (Japan-focused)

When disruptions hit, freight rates aren’t the only cost. Rollovers, missed appointments, and yard congestion trigger fees that many importers don’t budget for—until the invoice arrives. Here’s what to expect and how to reduce exposure.

Rollovers → Your cargo misses the intended sailing or flight. It sits at origin or at a transit point. You pay storage (days the cargo waits) and re-handling (moves when it’s shifted or re-stowed for the next sailing). The longer the delay, the higher the bill. LCL is especially exposed—consolidation adds steps; each one can incur charges.

Missed appointments → Your container clears NACCS but you can’t get a last-mile slot on the planned day. You pay rebooking (securing a new slot) and waiting time (detention or idle charges while the cargo sits). Post-peak or post-typhoon, slots fill fast—everyone rebooks at once. Plan ahead or expect to pay for priority.

Demurrage and detention (FCL) → Demurrage is port storage when your container stays at the terminal past the free time (typically 3–7 days). Detention is extra days with the empty box outside the port before you return it. Yard congestion—from typhoons, holidays, or backlog—extends free time or forces storage in overflow areas. Both add up quickly; a few extra days can cost hundreds of dollars.

Courier surcharges and remote area impacts → Express and air carriers add peak surcharges when demand spikes (post-disruption, holiday rushes). Remote area charges apply when delivery goes to a zone that’s harder to serve—typhoon damage or congestion sometimes forces deliveries to alternate addresses or backup warehouses. Check your quote for these; they’re often line items that appear only when things go wrong.

The glossary below summarises the main disruption fees. Build them into your buffer or negotiate cap clauses with your forwarder when you book.

Rollover storage
Storage at origin or transit when cargo misses the sailing/flight.
Re-handling
Extra moves when cargo is shifted or re-stowed (rollover, reroute).
Missed appointment rebooking
Fee to secure a new last-mile slot when you miss the original.
Waiting time
Detention or idle time when truck/warehouse can't accept delivery.
Demurrage
Port storage when the container stays at the terminal past free time (FCL).
Detention
Extra days with the empty container outside the port (FCL) before return.
Courier / peak surcharges
Express and air surcharges during peak or post-disruption.
Remote area
Extra charges when typhoon or congestion forces delivery to alternate zones.

Common mistakes to avoid

Four mistakes show up repeatedly on China→Japan shipments. They’re avoidable—and expensive when you don’t.

1. Booking on ETD without securing cut-offs (especially LCL/CFS) — ETD tells you when the vessel or flight is scheduled to leave. Cut-offs tell you when you must have cargo and docs in place to make that departure. Book space and assume “we’ll hit the cut-off” without confirming cargo-ready date, CFS receiving window, or CY gate-in—and you roll. LCL is the worst offender: CFS receiving in China is the gate that moves; miss it and you wait a week for the next consolidation. Lock cut-offs before you celebrate the ETD. See our shipping calendar for the sequence.

2. Not defining priority SKUs—so you can’t split intelligently — When disruption hits, “split shipment” (air for critical, sea for bulk) only works if you’ve decided which SKUs are critical. If you haven’t, your forwarder can’t execute. Define priority SKUs upfront: which items must arrive first for retail, production, or launch? Share that with your forwarder so they know what to put on the first flight or sailing and what can follow. No priority list = no intelligent split = you pay for air on everything or wait for sea on everything.

3. Believing “space confirmation” eliminates rollover risk — It doesn’t. Space confirmation means the forwarder has reserved capacity—not that your cargo will make that specific sailing or flight. Cargo late to CFS, docs wrong, equipment shortage, or carrier omission can still bump you. Treat confirmation as one step; hitting cut-offs and having a Plan B is the rest. During peak or typhoons, confirmations get rolled too. Stay close to your forwarder and have a backup option.

4. Ignoring last-mile and appointment capacity in Japan after disruption — Your container lands on time. NACCS clears. But last-mile appointment slots in Kanto or Kansai are full—everyone rebooked at once. Your cargo sits at the CFS or CY; you pay demurrage or detention. The bottleneck shifted from ocean to delivery. Plan for release + appointment, not just ETA. After a typhoon or holiday backlog, secure your delivery slot early or expect to wait—and pay—for it.

Bottom line

The best strategy for Japan = book earlier on cut-off, consolidation, and appointment—not just on ETD. Add a Plan B (split, reroute, or mode shift) before you need it, and peak season plus typhoons become manageable instead of paralyzing.

ReferenceGlossary· 44 terms

Search a term, or jump by letter.

backlog
Accumulation of cargo or shipments waiting to be processed. Common after holidays when ports, warehouses, and trucking catch up; plan buffer for post-holiday backlog in Japan.
cargo ready
When goods are packed, labelled, count confirmed, and released at the factory. The date from which pickup and transit to CFS/CY are planned. Plan it earlier than CFS cut-off for LCL.
CBM
Cubic metre. Standard unit for shipping volume; used for LCL pricing and container capacity.
CFS
Container Freight Station. Facility where LCL cargo is consolidated (origin) or deconsolidated (destination). Under FCA (CFS), the seller delivers loose cargo here; hand-off and risk transfer at receipt.
Chubu
Nagoya-area region (Aichi, Gifu, Mie). Japan's industrial heartland; land at Nagoya for Chubu destinations to avoid over-porting via Tokyo or Osaka.
clearance
Customs clearance. Process of presenting goods and documents to customs and obtaining release for import or export. Export clearance (who files it) is the key difference between EXW and FOB.
Commercial Invoice
Document stating value, description, and terms of the goods; required for customs and payment.
consignee
The party receiving the goods at destination. Named on the B/L and delivery documents.
consolidation
Combining several LCL shipments into one container at origin. Reduces cost per CBM; adds CFS time.
cut-offs
Deadlines by which cargo or documents must be received to make a specific sailing or flight. Missing one usually means a day's delay or roll to the next vessel.
CY
Container Yard. Terminal area where full containers are received, stored, and delivered. Under FCA (CY), the seller delivers the stuffed container here; hand-off and risk transfer at gate-in.
DDP
Delivered Duty Paid. Seller pays all costs to the buyer's door, including clearance, duties, and Consumption Tax. True DDP means the recipient pays nothing at delivery.
deconsolidation
Splitting an LCL container at destination into individual consignments for delivery.
demurrage
Charge when cargo stays at the terminal beyond the free time allowed. Often due to late docs or delayed pickup.
detention
Charge when a full container is held by the shipper or consignee beyond the free days (e.g. for loading, unloading, or return).
ETA
Estimated Time of Arrival. When a vessel or flight is expected at destination.
ETD
Estimated Time of Departure. When a vessel or flight is scheduled to leave origin.
FCL
Full Container Load. You book an entire container (e.g. 20GP or 40HC); only your cargo inside.
FOB
Free On Board. Seller delivers to the ship and clears export; buyer arranges freight and import from ship's rail. Risk transfers when goods are on board the vessel. Sea freight only—use FCA for air. For containers, the 'on board' moment is often unclear; FCA (CY/CFS) can be cleaner.
forwarder
Freight forwarder. Company that books transport, arranges documentation, and often coordinates customs on your behalf.
gate-in
When a container or cargo is received at the terminal; the carrier or terminal issues a receipt. Under FCA, risk transfers at gate-in. Carriers add on-board notation to the B/L after gate-in once the container is loaded.
Golden Week
Japanese holiday period (late April–early May). Ports and warehouses slow or closed; book 2 weeks ahead or plan around it.
Incoterms
International Commercial Terms. Standard rules (EXW, FOB, CIF, DDP, etc.) defining who pays, who clears customs, and when risk transfers at each stage.
Kansai
Osaka-area region (Osaka, Kobe, Kyoto). Often more logistics-friendly than Kanto—larger industrial zones—but slots and safety rules stay strict.
Kanto
Tokyo-area region (Tokyo, Yokohama, Chiba, Saitama). Stricter last-mile constraints: congestion, narrow access, truck size caps (2t/4t), short gate lead times.
last-mile
Final leg of delivery from port, airport, or warehouse to the consignee's address. May include remote-area or residential surcharges.
LCL
Less than Container Load. Your cargo shares a container with others; priced per CBM (plus CFS and handling at both ends).
mode shift
Switching part or all of a shipment to a different transport mode (e.g. sea to air) when disruption hits. Define allowable mode shifts with your forwarder before booking.
NACCS
Nippon Automated Cargo and Port Consolidated System. Japan's electronic customs clearance system for sea, air, and express. Under DAP the buyer's broker files; under DDP the seller's broker or IOR files.
New Year
Japan: late December to early January when many businesses, ports, and warehouses close or reduce operations. Plan shipments to avoid arrival during this window; expect backlog after reopening.
Obon
Japanese holiday period (mid-August). Warehouses and trucking slow; plan for delays and harder-to-secure appointment slots.
Packing List
Document listing contents, weights, and packaging of each package; used for customs and cargo handling.
pickup
Factory collection. Truck books, loads at origin, and transports cargo to the CFS, CY, or airport. Distance, multi-supplier stops, and cargo readiness affect cost.
pre-clearance
Submitting import documents before cargo arrives (Japan: Pre-arrival Examination). Reduces clearance time; requires B/L or AWB and permits ready in advance.
PSE
Product Safety of Electrical Appliances and Materials. Japan's mandatory certification for electrical products under DENAN. Format (diamond vs circle) depends on product category.
REACH
Registration, Evaluation, Authorisation and Restriction of Chemicals (EC 1907/2006). EU regulation controlling chemicals in products imported into Portugal.
rebooking
Booking a new delivery appointment after missing the original slot. Triggers rebooking fee and delay (often 2–3 days in peak).
remote area
Delivery zone that triggers an extra surcharge (e.g. courier or trucking) because of distance or access. Confirm if your Japan address is remote.
roll
When cargo misses a cut-off and is moved to the next sailing or flight. 'You roll to the next one' = +7 days or more for sea; plan cut-offs to avoid rolling.
rollover
When cargo misses a cut-off and is bumped to the next sailing or flight. Same as 'roll'; typically +7 days for sea. LCL and CFS cut-offs are the main rollover triggers.
TELEC
Telecom Engineering Center. Designated certification body for radio equipment under Japan's Radio Law. Often used as shorthand for TELEC/MIC approval.
VGM
Verified Gross Mass. Mandatory certified weight of a packed container (SOLAS); required before loading.
volumetric weight
Billable weight used by air and express when cargo is light but bulky. (Volume in cm³ ÷ divisor.) Can be 2–3× actual weight; check how your carrier calculates it.
waiting time
Charge when the truck waits beyond the free grace period (often 30–60 min). Japan last-mile bills quickly per 15–30 min after that; budget for buffer in quotes.